Southwick’s Zoo

Public Water Supply

Project Reference:
Southwick’s Zoo
Mendon, MA

Project Schedule:
1998 – 2004 Public Water Supply Project

Key Personnel:
Greg Roy, P.E., Project Manager
Brandon Ducharme, R.S., Wetland Specialist

The Southwick?s Zoo was experiencing issues with system reliability due to a water pump system that had reached its functional life.? Engineers at D&D designed a new Booster Station which satisfied the stringent requirements for reliability of the Zoo.? The system utilized atmospheric storage tanks, a variable frequency drive booster pump system to provide both redundancy and energy efficiency all housed in a new pump house for easy access.